SUM 5.77% 27.5¢ summit minerals limited

we need drill on the ground :) hopefully soon

  1. 945 Posts.
    lightbulb Created with Sketch. 27
    we need drill on the ground hopefully soon
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
27.5¢
Change
0.015(5.77%)
Mkt cap ! $22.57M
Open High Low Value Volume
27.5¢ 28.5¢ 24.5¢ $479.6K 1.810M

Buyers (Bids)

No. Vol. Price($)
2 11025 26.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.5¢ 41878 1
View Market Depth
Last trade - 16.10pm 17/09/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.