SUM 16.0% 29.0¢ summit minerals limited

Ann: Further High-Grade Niobium Results from Equador - Brazil, page-409

  1. 99 Posts.
    lightbulb Created with Sketch. 8
    https://hotcopper.com.au/data/attachments/6275/6275064-f864ddb6d0fd40e5a2284fb7cbba77f8.jpg
    For RC drilling, it only costs $50 a metre to drill in Brazil, which is four to five times the cost in Australia and Canada.
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
(20min delay)
Last
29.0¢
Change
0.040(16.0%)
Mkt cap ! $18.04M
Open High Low Value Volume
25.5¢ 30.0¢ 25.0¢ $578.4K 2.139M

Buyers (Bids)

No. Vol. Price($)
3 36331 29.0¢
 

Sellers (Offers)

Price($) Vol. No.
29.5¢ 12000 1
View Market Depth
Last trade - 16.10pm 12/07/2024 (20 minute delay) ?
SUM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.