Key take away is the sourcing of another $7m in loans from the big backers. Not the $19m they were chasing but a decent chunk. 1 year loan, no mention of interest rate.
15,000t for August. If we assume grade of .5% and a recovery of 70% for the month it would result in around 5000MTUs of contained tungsten in concentrate. Given zero information as to production rates/recoveries/shipment sizes this is pure speculation. We are now half way through September and still only two shipments have been made so I think it is likely that they are falling well short of 5000MTUs produced in August.
- Forums
- ASX - By Stock
- Ann: Further Progress at Dolphin Tungsten Mine
Key take away is the sourcing of another $7m in loans from the...
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G6M (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.10M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
G6M (ASX) Chart |
Day chart unavailable