The following works are underway as a matter of priority to advance the McIntosh Graphite Project:
• Maiden drill program – on track for commencing May 2023
• Preliminary Ore sorting study
• Metallurgical testwork campaign
• Battery Anode qualification testwork commencement
• Downstream Processing Facility Scoping Study including a site selection study
• Delivery of updated McIntosh Upstream Pre-Feasibility study
Plenty to look forward to here for the remainder of the year, buying at this ridiculous low price. I feel this will break out here real soon.
- Forums
- ASX - By Stock
- GCM
- Ann: FURTHER SPG BATTERY ANODE POTENTIAL AT MCINTOSH GRAPHITE
Ann: FURTHER SPG BATTERY ANODE POTENTIAL AT MCINTOSH GRAPHITE, page-2
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.773M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $24.34K | 12.17M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 3281431 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 10421868 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 2281431 | 0.002 |
22 | 31430115 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 10421868 | 7 |
0.004 | 16043731 | 11 |
0.005 | 5506981 | 5 |
0.006 | 2299480 | 10 |
0.007 | 855098 | 3 |
Last trade - 10.18am 09/08/2024 (20 minute delay) ? |
Featured News
GCM (ASX) Chart |