GCM 0.00% 0.2¢ green critical minerals limited

The following works are underway as a matter of priority to...

  1. 5,106 Posts.
    lightbulb Created with Sketch. 659
    The following works are underway as a matter of priority to advance the McIntosh Graphite Project:
    • Maiden drill program – on track for commencing May 2023
    • Preliminary Ore sorting study
    • Metallurgical testwork campaign
    • Battery Anode qualification testwork commencement
    • Downstream Processing Facility Scoping Study including a site selection study
    • Delivery of updated McIntosh Upstream Pre-Feasibility study

    Plenty to look forward to here for the remainder of the year, buying at this ridiculous low price. I feel this will break out here real soon.
 
watchlist Created with Sketch. Add GCM (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $2.773M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $24.34K 12.17M

Buyers (Bids)

No. Vol. Price($)
5 3281431 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 10421868 7
View Market Depth
Last trade - 10.18am 09/08/2024 (20 minute delay) ?
GCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.