NVA 0.00% 13.5¢ nova minerals limited

Ann: Further Visible Gold Intersected at RPM, page-29

  1. 6,126 Posts.
    lightbulb Created with Sketch. 1488
    I've highlighted Train/Trumpet (top) and RPM (bottom).

    RPM looks like the one with less snow cover and easier access, so it makes sense for that one to come first.

    I guess Train would begin a month after RPM, more towards peak-summer.

    https://hotcopper.com.au/data/attachments/5457/5457949-5d2d9b8537b1d97a8f7b4eef4da9c7dd.jpg
    Unless they had an excess of drill rigs and the capability to get through the snow to get started on Train sooner.
 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.