MIN 1.52% $51.99 mineral resources limited

Ann: FY20 Results Information Pack, page-12

  1. 71 Posts.
    lightbulb Created with Sketch. 3
    Included with the praise we should also consider what is not reported. Namely production from Koolyanobbing reduced from 15 million tons to a maximum of 12.7 million & the Next Generation plant only operational from 2Q 21 instead of June 2020. What has gone wrong?? Also,why is CE not proceeding immediately with Buckland (already fully permitted) & Kumina?
 
watchlist Created with Sketch. Add MIN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.