Project well progressed1
– Melt Shop commissioning well underway with numerous heats
successfully completed
– Equipment installation substantially complete for the ladle metallurgy
furnace; second caster and tunnel furnace are well advanced with
equipment set and piping and electrical installation works now
commencing
– First coil expected in early 2H FY2022
– Expect an 18 month ramp up to full run rate to follow commissioning
If you are referring to Northstar construction should be finished shortly (2H FY22) however it will take some time to get to full production.
- Forums
- ASX - By Stock
- Ann: FY2021 Full Year Results ASX Release
Project well progressed1– Melt Shop commissioning well underway...
-
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BSL (ASX) to my watchlist
|
|||||
Last
$20.32 |
Change
0.400(2.01%) |
Mkt cap ! $8.942B |
Open | High | Low | Value | Volume |
$19.92 | $20.32 | $19.61 | $40.11M | 1.987M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100 | $20.28 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$20.32 | 1903 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100 | 20.280 |
2 | 17218 | 20.250 |
1 | 2676 | 20.240 |
3 | 6225 | 20.230 |
1 | 2411 | 20.220 |
Price($) | Vol. | No. |
---|---|---|
20.340 | 2137 | 3 |
20.350 | 991 | 2 |
20.370 | 14250 | 1 |
20.380 | 100 | 1 |
20.440 | 1500 | 1 |
Last trade - 16.10pm 27/06/2024 (20 minute delay) ? |
Featured News
BSL (ASX) Chart |