    NPV5 of A$198 million and Post Tax IRR of 20.3% at US$1,700/oz gold price
    Highlights
    • Ore Reserves: Increased by 7% to 618,000 ounces of contained gold.
    • Mineral Resources: Increased by 7% to 836,000 ounces of contained gold.
    • Strong Project Economics: Post-tax NPV (discount rate 5%) of C$174 million (A$198 million) and post-tax IRR
    of 20.3% using a long-term gold price of US$1,700 per ounce, exchange rates of C$1.00 = US$0.78 and C$1.00
    = A$1.14.
    • Capital Efficient Outcome: Initial capital of C$182 million (A$207 million) including mine pre-production, mine
    fleet, processing, and infrastructure (roads, power distribution, tailings facility, ancillary buildings and water
    management).
    • Low unit costs: Life of mine All-In Sustaining Cost for this low strip ratio project estimated to be US$992 per
    ounce (A$1,445 per ounce).
    • Efficient Layout: Consolidation of infrastructure and efficient storage of waste and low-grade materials has
    greatly reduced surface disturbance.
    • Stable Production Profile: Average 55 – 60 koz gold produced per year over the 11 year life of mine.
    • Short Construction and Ramp-Up Time Frame: Optimised starter tailings dam will shorten construction time
    frame to <12 months. Utilisation of existing equipment from Touquoy mine will de-risk commissioning and allow
    for short ramp up to commercial production.
    St Barbara Limited (“St Barbara” or the “Company”) (ASX: SBM) is pleased to announce the completion of the Pre-feasibility
 
watchlist Created with Sketch. Add SBM (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
0.010(4.65%)
Mkt cap ! $184.0M
Open High Low Value Volume
21.5¢ 22.8¢ 21.5¢ $512.5K 2.296M

Buyers (Bids)

No. Vol. Price($)
9 492803 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 548490 8
View Market Depth
Last trade - 16.10pm 23/07/2024 (20 minute delay) ?
SBM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.