Announcement March 2019
A Cadoux Kaolin Project Bankable Feasibility Study (FSO) is expected in late September quarter 2019
At the FSO, too, FYI is again focusing on the experts who have already prepared the pre-feasibility study for crucial components.For example, GR Engineering Services will design and evaluate asset plans, investment and operating cost estimates, and infrastructure requirements.
It is understandable that the company is once again relying on GR Engineering, as the experts have already completed dozens of projects and prepared feasibility studies on more than 160 projects from many commodity areas worldwide.
In addition, GR Engineering has a particularly high level of expertise in the field of HCl separation, which should definitely be an advantage for the successful completion of the FSO.
- Forums
- ASX - By Stock
- Ann: FYI Advances Pilot Plant Towards First HPA Product
Announcement March 2019A Cadoux Kaolin Project Bankable...
Featured News
Add CCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.0¢ |
Change
0.003(6.38%) |
Mkt cap ! $18.54M |
Open | High | Low | Value | Volume |
5.0¢ | 5.2¢ | 4.7¢ | $5.276K | 104.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 66290 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 41666 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 66290 | 0.050 |
1 | 36235 | 0.046 |
2 | 257330 | 0.045 |
1 | 100000 | 0.044 |
1 | 100000 | 0.043 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 41666 | 1 |
0.055 | 97127 | 3 |
0.060 | 146186 | 4 |
0.062 | 28333 | 1 |
0.064 | 29702 | 1 |
Last trade - 14.53pm 19/11/2024 (20 minute delay) ? |
Featured News
CCM (ASX) Chart |