CCM 11.1% 5.6¢ cadoux limited

Ann: FYI & ALCOA SIGN BINDING JV TERM SHEET FOR FYI HPA PROJECT, page-309

  1. 33 Posts.
    lightbulb Created with Sketch. 5
    Your right but a decision on the larger plant is unlikely to be made until the demonstration plant has demonstrated for a reasonable time that it can produce consistent high grade product. As I point out even if every thing goes to plan this is unlikely to achieved until mid 2024 (6 months detailed design and planning, 1 year construction, 1 year production). Another year to build bigger plant at minimum takes you to mid 2025.
 
watchlist Created with Sketch. Add CCM (ASX) to my watchlist
(20min delay)
Last
5.6¢
Change
-0.007(11.1%)
Mkt cap ! $20.77M
Open High Low Value Volume
5.6¢ 5.6¢ 5.5¢ $6.005K 108.1K

Buyers (Bids)

No. Vol. Price($)
1 9000 5.6¢
 

Sellers (Offers)

Price($) Vol. No.
5.8¢ 285090 1
View Market Depth
Last trade - 15.51pm 14/08/2024 (20 minute delay) ?
CCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.