With Alcoa, project was almost stalled. I think this is good that FYI got the full control and can move the project forward at rapid pace. Nothing is lost as Project is still with FYI and project economics still remains as it was prior to Alcoa signing the term sheet (shit) with FYI.
- Forums
- ASX - By Stock
- CCM
- Ann: FYI Resumes Control of HPA Project
Ann: FYI Resumes Control of HPA Project, page-16
-
- There are more pages in this discussion • 226 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $20.02M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 154123 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.9¢ | 14650 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 154123 | 0.054 |
2 | 86935 | 0.053 |
1 | 100000 | 0.052 |
2 | 490000 | 0.051 |
1 | 12026 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.059 | 14650 | 1 |
0.060 | 32978 | 2 |
0.061 | 4339 | 1 |
0.063 | 40580 | 2 |
0.064 | 182090 | 1 |
Last trade - 10.02am 10/09/2024 (20 minute delay) ? |
Featured News
CCM (ASX) Chart |
Day chart unavailable