"Second to none": Prefeasibility puts FYI Resources at the top of the competition!
In a webinar, Roland Hill has called the results pre-feasibility literally "second to none."
In terms of cost-effectiveness, FYI moves in the first quartile.
The task of the pilot plant: it is about checking the flowchart of the pre-feasibility and at the same time simulating the processes of the later large-scale production as realistically as possible.
By the end of November FYI wants to have completed the complete feasibility study.Where the results of the pilot plant should be included.
There have been over 20 laboratory samples leading up to the major manufacturers in Europe and Asia.The potential customers in Asia and Europe are already waiting for the pilot plant material thus obtained.(5 kg per customer)
If the feedback from potential customers is positive, FYI Resources wants to negotiate off-take contracts in the next step.
- Forums
- ASX - By Stock
- Ann: FYI's HPA Pilot Plant Commences Trial Production
"Second to none": Prefeasibility puts FYI Resources at the top...
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.6¢ |
Change
-0.004(6.67%) |
Mkt cap ! $20.77M |
Open | High | Low | Value | Volume |
5.4¢ | 5.6¢ | 5.4¢ | $920 | 16.86K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6407 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.8¢ | 150000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6407 | 0.054 |
1 | 85735 | 0.053 |
1 | 100000 | 0.052 |
2 | 490000 | 0.051 |
1 | 12026 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.058 | 150000 | 1 |
0.060 | 138816 | 2 |
0.062 | 18300 | 1 |
0.063 | 40580 | 2 |
0.065 | 297086 | 1 |
Last trade - 15.33pm 18/09/2024 (20 minute delay) ? |
Featured News
CCM (ASX) Chart |