NIM nimy resources limited

However, and just as an AI hypothetical, it seems possible to be...

  1. 55 Posts.
    lightbulb Created with Sketch. 18
    However, and just as an AI hypothetical, it seems possible to be profitable with lower grades.
    ( not suggesting, it’s just purely interest )

    To determine if a deposit is profitable to mine, we need to consider several factors beyond just the grade and tonnage. Here's a more detailed analysis:*Assumptions*1. *Gallium price*: $248.38 per kilogram (current market price)2. *Mining and processing costs*: $50-70 per tonne (average cost for similar deposits)3. *Recovery rate*: 80% (average recovery rate for gallium)4. *Capital expenditure*: $50-100 million (estimated initial investment)*Calculations*1. *Total gallium content*: 13.7 Mt x 44 ppm = 603,800 kg of gallium2. *Recoverable gallium*: 603,800 kg x 80% recovery rate = 483,040 kg of gallium3. *Revenue*: 483,040 kg x $248.38 per kilogram = $120 million (approximate revenue over the mine life)4. *Operating costs*: 13.7 Mt x $60 per tonne (average mining and processing cost) = $822 million (approximate operating costs over the mine life)5. *Capital expenditure*: $75 million (estimated initial investment, including contingency funds)*Break-Even Analysis*Based on these calculations, the break-even point would be around 5-7 years of operation, assuming a steady-state production rate and constant costs. However, this is a rough estimate and actual break-even times may vary.*Profitability*Considering the estimated revenue, operating costs, and capital expenditure, the project might be marginally profitable. However, there are several factors that could impact profitability, such as:- Fluctuations in gallium prices- Changes in mining and processing costs- Variations in recovery rates- Environmental and regulatory compliance costs- Potential for by-product credits (e.g., copper, zinc)*Conclusion*While the deposit has a significant amount of gallium, the profitability of the project is uncertain and depends on various factors. A more detailed feasibility study, including sensitivity analyses and risk assessments, would be necessary to determine the project's viability.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
9.1¢
Change
0.003(3.41%)
Mkt cap ! $21.88M
Open High Low Value Volume
8.8¢ 9.1¢ 8.7¢ $45.42K 504.7K

Buyers (Bids)

No. Vol. Price($)
1 233764 9.1¢
 

Sellers (Offers)

Price($) Vol. No.
9.2¢ 20000 1
View Market Depth
Last trade - 16.10pm 25/07/2025 (20 minute delay) ?
NIM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.