KEY 0.00% 0.1¢ key petroleum limited

Ann says that exploration well needs to be completed before 28...

  1. 57 Posts.
    lightbulb Created with Sketch. 14
    Ann says that exploration well needs to be completed before 28 May 2021. Any thoughts on timeline?
    https://hotcopper.com.au/data/attachments/2267/2267841-d0498a61ae4ab007c52002fb14fd2b2c.jpg
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.