Did you actually read the announcement? If not here is the respective piece.
"Neither hole was completed to total depth due to, the drill rods becoming stuck in first hole (GAG001) while drilling the 9th meter and the drillers struggled to get them out. The team decided to move to drill the second hole (GAG002) while they developed a solution to recover the drill rods from the first hole. During drilling the second hole, the hydraulic pump on the drill rig failed completely at the 12th meter down the hole."
This is why they drilled in your words "two half holes" which is actually two holes!!
- Forums
- ASX - By Stock
- Ann: Gaoual Bauxite Project Drilling Update
Did you actually read the announcement? If not here is the...
-
-
- There are more pages in this discussion • 91 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LIN (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $108.3M |
Open | High | Low | Value | Volume |
9.4¢ | 9.4¢ | 9.4¢ | $118 | 1.254K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 298634 | 9.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.6¢ | 110600 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 0.094 |
1 | 400000 | 0.093 |
2 | 15000 | 0.092 |
3 | 150878 | 0.091 |
6 | 489989 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 110600 | 2 |
0.098 | 10752 | 1 |
0.099 | 74860 | 1 |
0.105 | 957723 | 8 |
0.110 | 279986 | 3 |
Last trade - 14.35pm 01/11/2024 (20 minute delay) ? |
Featured News
LIN (ASX) Chart |