QPM 15.6% 3.7¢ queensland pacific metals limited

Ann: Gas Drainage at Carborough Downs Mine, page-95

  1. 2,576 Posts.
    lightbulb Created with Sketch. 445
    I received a reply today to an email sent last week, part of the reply was the expected TPS running time was for 10 hours a day Monday to Friday.
    I think I will leave it there , maybe the MGP aquisition and the TPS gas contract will reveal more details.
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.