IVZ 2.86% 6.8¢ invictus energy ltd

Ann: Gas Sales Agreement to Deliver Power to Eureka Gold Mine, page-205

  1. 1,352 Posts.
    lightbulb Created with Sketch. 674
    Sounds easy to just chuck a generator onsite and then twist a few wires together on the 33KV CCT and then just turn on the switch.....
    This is a pick of a 50MW Combined Cycle Gas fired turbine plant.
    https://hotcopper.com.au/data/attachments/6130/6130461-4a578502ddd720ccbc70efe2d28adf40.jpg
    The building on the left where the two bright lights are shining is the Turbine Hall. The structure in front of you is the Exhaust Gas to Steam plant which provides the MD pressure stem to drive the second stage of the Combined Cycle Plant. This combined with Gas Separator Plant plus water cooling plant takes up quit a bit of space, and not a five minute job to build. Just the plinth for the turbine & generator beds would take around 8 months to build.
    It is a very specialist area to construct and our position would best be to invest in the power plant and supply gas from the Separator plant.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
-0.002(2.86%)
Mkt cap ! $96.41M
Open High Low Value Volume
7.0¢ 7.0¢ 6.7¢ $209.3K 3.083M

Buyers (Bids)

No. Vol. Price($)
3 763774 6.8¢
 

Sellers (Offers)

Price($) Vol. No.
6.9¢ 60000 2
View Market Depth
Last trade - 16.10pm 24/05/2024 (20 minute delay) ?
Last
6.8¢
  Change
-0.002 ( 1.45 %)
Open High Low Volume
6.8¢ 6.9¢ 6.7¢ 1662523
Last updated 15.58pm 24/05/2024 ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.