IVZ 4.05% 7.7¢ invictus energy ltd

they can build much smaller pure gas turbine plants without the...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 682 Posts.
    lightbulb Created with Sketch. 78
    they can build much smaller pure gas turbine plants without the boiler (the heat exchanger / big thing in the picture).

    This is a much smaller solution and arguable modular and much easier to stand up than a combined plant (and probably make most sense when looking at a smaller solution).

    Combined plants, which is what Brent has posted is a gas turbine with a boiler too, to recover the heat then this is cycled through a steam turbine.

    Smaller option is only 30-40% efficient in power generation. Conbined plants are 50-60% I believe so obviously the greenest option.

    100% Combined cycle plant makes sense for bigger plants. But I think you can go smaller with just gas turbines to get up and running. Then move to Combined cycle (gas turbine + recovery heat exchanger + steam turbine) for larger plants to maximize the efficiency.

    gas turbines alone will be a much cheaper option.

    Correct me if I'm wrong Brentb?
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
7.7¢
Change
0.003(4.05%)
Mkt cap ! $116.7M
Open High Low Value Volume
7.6¢ 7.7¢ 7.5¢ $36.27K 480.4K

Buyers (Bids)

No. Vol. Price($)
2 113950 7.5¢
 

Sellers (Offers)

Price($) Vol. No.
7.7¢ 123586 3
View Market Depth
Last trade - 16.10pm 04/10/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.