IVZ 1.25% 8.1¢ invictus energy ltd

Why on earth would you pick US construction costs with the most...

  1. 5,724 Posts.
    lightbulb Created with Sketch. 1117
    Why on earth would you pick US construction costs with the most expensive labour? As an example, the Indians construct gas trunk lines for RS 6-7 crore per km. That is between $700,000 and $850,000 usd per km. I would assume overhead power transmission lines to be cheaper. Is Zimbabwe labour more expensive than Indian? Would have to look into it.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
8.1¢
Change
0.001(1.25%)
Mkt cap ! $116.6M
Open High Low Value Volume
8.1¢ 8.1¢ 7.9¢ $50.04K 625.9K

Buyers (Bids)

No. Vol. Price($)
4 239133 7.9¢
 

Sellers (Offers)

Price($) Vol. No.
8.0¢ 100000 1
View Market Depth
Last trade - 15.38pm 16/08/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.