IVZ 5.33% 7.1¢ invictus energy ltd

Why on earth would you pick US construction costs with the most...

  1. 5,716 Posts.
    lightbulb Created with Sketch. 1111
    Why on earth would you pick US construction costs with the most expensive labour? As an example, the Indians construct gas trunk lines for RS 6-7 crore per km. That is between $700,000 and $850,000 usd per km. I would assume overhead power transmission lines to be cheaper. Is Zimbabwe labour more expensive than Indian? Would have to look into it.
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
7.1¢
Change
-0.004(5.33%)
Mkt cap ! $100.6M
Open High Low Value Volume
7.3¢ 7.4¢ 7.0¢ $164.6K 2.293M

Buyers (Bids)

No. Vol. Price($)
1 32787 7.1¢
 

Sellers (Offers)

Price($) Vol. No.
7.3¢ 600835 2
View Market Depth
Last trade - 16.10pm 17/07/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.