IVZ 4.69% 6.1¢ invictus energy ltd

Ann: Gas Sales MOU Signed for 500MW Gas to Power Project, page-278

  1. 622 Posts.
    lightbulb Created with Sketch. 165
    Typically gas producers pay much of the pipeline infrastructure to market/refiners or in JV with industrial gas distributors.   Av cost of US gas pipeline construction in 2015-16 around $7.65 million/mile ($4.75 million/km). Doubt that Zimbabwe costs would be lower than this and materials have virtually doubled over the past 9 years.   How does that relate to IVZ ...   I held CTP for almost 15 years on the basis of many finds of O & G that mostly were uneconomic in scale or relied upon expensive infrastructure that compromised financial viability - not always but enough times.  I do hope that IVZ can maximise its discoveries but have serious concerns on bringing the potential to production.  Oil you can store in tanks & road tankers whereas gas requires more complicated infrastructure to maximise the resource.  Just saying IVZ still has a lot of project workings to do before the party can get serious.
    I did hold IVZ earlier this year and now just monitoring the situation.
    Best for 2024 GLTAHs
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
(20min delay)
Last
6.1¢
Change
-0.003(4.69%)
Mkt cap ! $86.49M
Open High Low Value Volume
6.3¢ 6.3¢ 6.0¢ $65.91K 1.078M

Buyers (Bids)

No. Vol. Price($)
3 178000 6.0¢
 

Sellers (Offers)

Price($) Vol. No.
6.2¢ 13105 1
View Market Depth
Last trade - 12.14pm 19/06/2024 (20 minute delay) ?
IVZ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.