I love your work AussieStonker.
Did you allow for the works around 6,000 feet, or just carried the drilling below at the same drill-rate? If you didn't provide for work at that depth then you probably need to allow another couple of days below 6,000 feet:
"The well will continue drilling to the 9 5/8” casing point (nominally 6,000 feet), which is expected in the coming
days. The actual casing point will be determined by mud weights, in order to not damage the Kione ‘gas-shows’
reservoirs. At that time, the bit will be tripped to the surface, conditioning the hole in readiness for logging. The
section below 1,800 feet will then be petrophysically logged for further assessment of the gas shows, and then
cased to secure the ‘gas-shows’ zone for later testing. "
- Forums
- ASX - By Stock
- XST
- Ann: Gas Shows at Borba 1-7
Ann: Gas Shows at Borba 1-7, page-55
-
- There are more pages in this discussion • 220 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add XST (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.893M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
XST (ASX) Chart |
Day chart unavailable