- Release Date: 10/10/14 10:58
- Summary: GENERAL: NTL: Health and Safety plan lodged
- Price Sensitive: No
- Download Document 1.49KB
NTL 10/10/2014 10:58 GENERAL REL: 1058 HRS New Talisman Gold Mines Limited GENERAL: NTL: Health and Safety plan lodged 10th October 2014 FOR IMMEDIATE RELEASE ANNOUNCEMENT BY NEW TALISMAN GOLD MINES LIMITED (NTL) HEALTH AND SAFETY PLAN FOR TALISMAN MINE LODGED New Talisman Gold Mines (NTL) today announces that it has completed and lodged with the High Hazards Unit, the Health and Safety management plan for the Talisman Gold mine. This body of work has taken 6 months and was developed with a working group of specialist independent consultants lead by Principal Mining Engineer of Talisman Mr Wayne Chowles. The plan is the first documentation, compliant with the new Health and Safety legislation, to be lodged with High Hazards Unit for an underground gold mine in NZ, and establishes the framework for Talisman to operate a safe and sustainable mining operation. Mr Wayne Chowles principal mining engineer noted that "We have always considered the safety of our workforce as our highest priority and the comprehensive hazard management system set out in the documentation provides a solid base for achieving this. This is the last legislative hurdle on the path to reopening the historically productive Talisman Gold mine. Works at the mine can commence on 13th December 2014." Matthew Hill CEO New Talisman Gold Mines Limited Direct +64 27 5557737 [email protected] For more information on New Talisman Gold Mines go to www.newtalisman.co.nz End CA:00256303 For:NTL Type:GENERAL Time:2014-10-10 10:58:18
Add to My Watchlist
What is My Watchlist?