FM3 firstmac mortgage funding trust no. 4 series 1-2020

Think the bottom hole 92 you have on your map is a typo, there...

  1. 2,367 Posts.
    lightbulb Created with Sketch. 1796
    Think the bottom hole 92 you have on your map is a typo, there is another 92 to the north.

    Hole 95 is a fairly wide step out, past the valley, hopefully it hits something decent.

    Looks like the majority of the new drills is focusing on extending into the Eastern Target.

    Productivity analysis is that since the previous ann 19/2/21 we completed up to hole 101.

    Has been 14 days between anns and we have drilled another 12 holes, so that is 6 holes per week. If we maintain this productivity till the end of may, we will easily squeeze in another 72 holes @ approx 300m per hole = 21,600m

    Looks like we will get the full 30,000m initial drilling into the MRE!


 
watchlist Created with Sketch. Add FM3 (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.