NRZ 0.00% 0.4¢ neurizer ltd

Of course, Stage 2 is the main prize, Pie. It'll only take the...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 2,528 Posts.
    lightbulb Created with Sketch. 570
    Well, I hadn't thought of trying to power the bright lights of Pt Augusta until you published your photo. I was thinking of Copley, population 73 [2016 Census] which is 5-10 Km away. But it'll need a transmission line [or a long extension cord] from the site and also one of Elon Musk's batteries would be needed too, for periods when both gensets are down. Seems like too much trouble for a very small return so I'm thinking there are no realistic commercial possibilities.
    A large storage battery on site would be useful, though, because with both generators down there would be no power to power the compressors to start up the gasifier chambers to run the generators. It's a closed loop.

    Of course, Stage 2 is the main prize, Pie. It'll only take the equivalent of 38 more Sieman's generators to make the 100 MW of power needed to run the urea plant. I'm looking forward to that.
 
watchlist Created with Sketch. Add NRZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.