Looks like two lengthy 20MW discharges today with the second still underway. Been discharging since 7PM AEST.
- Forums
- ASX - By Stock
- GNX
- Ann: Genex achieves energisation of Bouldercombe Battery Project
Ann: Genex achieves energisation of Bouldercombe Battery Project, page-66
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)