GNX 1.85% 26.5¢ genex power limited

Says on this link that it should be in service by end of...

  1. 153 Posts.
    lightbulb Created with Sketch. 19
    Says on this link that it should be in service by end of September.

    https://leadertoday.com.au/news/2023/07/23/bouldercombes-big-bessie-goes-live/

    Speaking on site at Bouldercombe, Genex Power chief operations officer Arran McGhie said construction had started on the 50MW Genex Bouldercombe Battery Project in mid-2022.
    With Big Bessie now fully operational, the battery will undergo testing over the next six to eight weeks and should be fully commissioned by the end of September
 
watchlist Created with Sketch. Add GNX (ASX) to my watchlist
(20min delay)
Last
26.5¢
Change
-0.005(1.85%)
Mkt cap ! $367.0M
Open High Low Value Volume
27.0¢ 27.0¢ 26.5¢ $107.1K 400.0K

Buyers (Bids)

No. Vol. Price($)
41 29452480 26.5¢
 

Sellers (Offers)

Price($) Vol. No.
27.0¢ 1901860 31
View Market Depth
Last trade - 16.10pm 13/06/2024 (20 minute delay) ?
Last
26.8¢
  Change
-0.005 ( 0.00 %)
Open High Low Volume
27.0¢ 27.0¢ 26.8¢ 256043
Last updated 15.59pm 13/06/2024 ?
GNX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.