NVA 0.00% 14.5¢ nova minerals limited

Ann: Geophysics confirms extension of RPM high-grade gold deposit, page-63

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,287 Posts.
    lightbulb Created with Sketch. 1070
    Good observations, I just had a chat with Louie and he mentioned that the $3.50 /oz cost INCLUDES all capital costs for the camp and equipment that they expended already. So the real cost going forward will actually be lower than $3,50 (assuming they keep their discovery rate as epr before).

    Before the set up of the prep facility, we we were drilling at 230$/meter all in, so even a 20,000 meter drilling program for RPM would cost $4.5 M in the old set up (and many % percentage points less in the new set up with prep facility). Maybe $3.5 M. Crazy cheap.

    They can ramp and scale down exploration if and when needed and still develop the projects as a lot of Korbel is engineering work now that they say they will absolutely watch costs on.

    2022 is Game On! for NVA

 
watchlist Created with Sketch. Add NVA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.