I was happy with this in the bottom drawer just for H2 shipping and possibly LNG. This ann makes it even more enticing to leave in the drawer and most likely even top up and double my original buy in.
Agree @Ando30 some leaky ship over last couple of weeks, momentum was to good. I thought it was based on green H2 hype, believe otherwise now. gltah
- Forums
- ASX - By Stock
- Ann: GEV to Develop 2.8 GW Green Hydrogen Export Project
I was happy with this in the bottom drawer just for H2 shipping...
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PV1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.35M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 540 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.2¢ | 255072 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 540 | 0.018 |
5 | 568800 | 0.017 |
6 | 442706 | 0.016 |
2 | 1010000 | 0.015 |
1 | 100000 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.022 | 255072 | 2 |
0.023 | 276239 | 3 |
0.025 | 9624 | 2 |
0.026 | 263379 | 3 |
0.027 | 134368 | 2 |
Last trade - 10.06am 18/09/2024 (20 minute delay) ? |
Featured News
PV1 (ASX) Chart |
Day chart unavailable