Ann: Gindara-1 Drilling Status , page-2

  1. 3,109 Posts.
    lightbulb Created with Sketch. 31
    Gindara-1 Drilling Status

    Nido Petroleum Limited (?Nido?, ASX: NDO) on behalf of the SC 54B Joint Venture wishes to correct a statement made in the Memorandum to The Philippine Stock Exchange, Inc.
    released by the Department of Energy on 23 May 2011.

    Whilst drilling the 17-1/2? hole at 747 metres MD (725 metres TVDss) the drill string became stuck. Following jarring operations the drill string was successfully freed and there was no need to re-spud the well.

    Current drilling operations are continuing to drill the 17-1/2? hole at 774 metres MD (752 metres TVDss). A progress report will be released as scheduled on Thursday, 26 May 2011.
 
watchlist Created with Sketch. Add RPM (ASX) to my watchlist
(20min delay)
Last
6.7¢
Change
0.000(0.00%)
Mkt cap ! $16.90M
Open High Low Value Volume
6.6¢ 6.7¢ 6.6¢ $3.409K 51.12K

Buyers (Bids)

No. Vol. Price($)
3 620871 6.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.8¢ 200000 1
View Market Depth
Last trade - 14.00pm 17/07/2024 (20 minute delay) ?
RPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.