The recently drilled Glenaras 17A monitoring well has provided a significant breakthrough
in understanding the production characteristics within the Betts Creek coal sequence.
❖ Glenaras 17A has confirmed that the entire section from the R1 to the R7 coal is acting as
one contiguous system and is being depleted by the existing multi-lateral pilot (Pilot).
Importantly, it has also confirmed that the Betts Creek coal sequence is isolated from other
significant aquifer systems, particularly the overlying Hutton sandstone and Great Artesian
Basin.
❖ The Pilot continues to produce strongly and has achieved a significant pressure sink in the
Pilot area, which is approximately 85% progressed towards the Company’s goal of critical
desorption.
❖ Given the Pilot is depleting the entire coal section, clear potential exists to realise a much
larger initial 2P Reserves target in the order of 800 - 1,000 PJ.
❖ The remediation of the old legacy pilot wells at Glenaras and Rodney Creek has been
completed. The Pilot performance is being carefully monitored to observe any impacts from
this programme.
❖ Schlumberger has been commissioned to undertake reservoir simulation modelling to
analyse the current production and pressure performance of the Pilot and to optimise future
development options.
❖ In parallel, the Company is rapidly progressing with drilling rig contractors and long-lead
procurement for an imminent drilling campaign within the Pilot area, all of which is expected
to be well within the Company’s existing cash reserves.
❖ Discussions have commenced with the Queensland Government for the conversion of ATP
2019 to a Potential Commercial Area (PCA), representing a key step in elevating the permit
towards a Petroleum Lease.
- Forums
- ASX - By Stock
- GLL
- Ann: Glenaras Gas Project Update
Ann: Glenaras Gas Project Update, page-2
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.493M |
Open | High | Low | Value | Volume |
2.5¢ | 2.5¢ | 2.2¢ | $1.693K | 71.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 46942 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.3¢ | 83069 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 46942 | 0.022 |
1 | 250000 | 0.020 |
3 | 177000 | 0.019 |
1 | 100000 | 0.018 |
1 | 107600 | 0.017 |
Price($) | Vol. | No. |
---|---|---|
0.023 | 83069 | 1 |
0.024 | 159000 | 1 |
0.025 | 41367 | 2 |
0.026 | 300000 | 1 |
0.029 | 41666 | 1 |
Last trade - 12.07pm 02/07/2024 (20 minute delay) ? |
Featured News
GLL (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online