PAB 0.00% 0.7¢ patrys limited

Ann: GMP Production of PAT-DX1 Next Quarter, page-60

  1. 7,276 Posts.
    lightbulb Created with Sketch. 945
    If nothing comes from left field between now and March why would the SP go up?

    It will take 3-6 months to get the ALL CLEAR if the engineering run is a success or a failure, if failed what do you think the CR will be done at then...This 9 months away rougly for results and PAB will be squint

    If we raise (to be on the safe side) before the engineering run results and around these levels(maybe discounted from 1c)then share holders will quickly forget the dilution if it is a success, also this can get DX-3 back into the game far quicker..

    Otherwise we have our main IP sitting idle and ALL and EVERTHING rests on the succsses on the Run, that is one huge gamble that Campbell would be taking as if it does fail for a third time then we can say good bye for a very long time or diluted to nothing....

    We need dx3 back online, hopefully we can get that funded with a partner hoping the BoD have not just sat on their hands for nearly 10 months and used their connections to get a funder...

    Otherwise Salty i am not keen on us all waiting on dx1 engineering run to see if we still have a compnay or not when our main IP is laying dormant when something can be done to get it back on track
    Last edited by mattyedw: 20/12/23
 
watchlist Created with Sketch. Add PAB (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $14.40M
Open High Low Value Volume
0.6¢ 0.7¢ 0.6¢ $589 91.50K

Buyers (Bids)

No. Vol. Price($)
24 4759154 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 1636778 2
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
PAB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.