If they have completed was it 15 holes then their drillers and their geologist will already have inspected the core and have a good idea of what they hit. The 2 labs in Townsville being ALS, SGS and Intertech are backed up but 2-3 weeks max turnaround. For a 50% extra charge they can analyse in 1 week and report on just the key intersections. The actual lab work takes 3 days.
ASX continuous disclosure requires immediate release of material information. Material information is that which could move the share price by 10%. If it’s good or bad that would move it 10% easy. Everything a speccy does is a material event.
Taking time to post on either Twitter or website means materiality so should be released to ASX instead or not at all.
If you are a positive supporter who wants share price increases then you should want it on ASX not Twitter.
All comms from an ASX company should always be via ASX platform else not a transparent market.
Having drilled 15 holes and not updated market on what they have seen is OK but not if you are tweeting about it.
- Forums
- ASX - By Stock
- Ann: GNM Commences Maiden Drilling Program at Camel Creek Project
If they have completed was it 15 holes then their drillers and...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNM (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $1.546M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 1031917 | 1.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 39650 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 1031917 | 0.010 |
2 | 433330 | 0.009 |
5 | 1239995 | 0.008 |
4 | 1258559 | 0.007 |
3 | 1200000 | 0.006 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 39650 | 1 |
0.012 | 83333 | 1 |
0.013 | 234537 | 2 |
0.015 | 78377 | 2 |
0.017 | 210000 | 1 |
Last trade - 16.12pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
1.1¢ |
  |
Change
0.000 ( 10.0 %) |
|||
Open | High | Low | Volume | ||
1.1¢ | 1.1¢ | 1.1¢ | 80000 | ||
Last updated 15.06pm 03/05/2024 ? |
Featured News
GNM (ASX) Chart |
Day chart unavailable