CTP 7.69% 4.8¢ central petroleum limited

Ann: GO-AHEAD FOR DEVELOPMENT OF MEREENIE GAS PROJECT, page-4

  1. 326 Posts.
    lightbulb Created with Sketch. 20
    This is a very prudent decision. If they can produce enough gas by drilling only one well to fill the NGP and provide a larger plant upgrade this will be the best way forward. No use drilling a second well at this stage if the gas will just sit there. Once cash starts rolling in and the NGP is expanded we can drill the second Mereenie well to fill increased capacity. The plant upgrade will already be completed ready for the extra gas and would also assist us with the gas from the first well.
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.