I can never understand why we always need to redo the analysis using the 1 meter splits. I mean, why don`t they just do that to start with? And to have to go back to site to collect them? Doesn`t make sense to me. Hopefully someone gets there first and spikes the samples with some good stuff lol
A bit more to come out of the results yet isn`t there..................
"The 4m composite samples taken during the Aircore drilling program were assayed using an Aqua Regia ICP-MS method that is not optimal for REE analysis. Reanalysis of the samples by the custom peroxide fusion method for REE may upgrade the results. Peroxide fusion is a complete digest that releases all REEs from the rock and into solution for analysis."
- Forums
- ASX - By Stock
- Ann: Gold and REE intersected at Laverton Project
I can never understand why we always need to redo the analysis...
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTN (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.715M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 5471633 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 4018589 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 5471633 | 0.003 |
13 | 12330009 | 0.002 |
15 | 17472610 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 4018589 | 7 |
0.005 | 6582505 | 11 |
0.006 | 2532000 | 5 |
0.007 | 880000 | 2 |
0.008 | 913756 | 2 |
Last trade - 10.02am 03/05/2024 (20 minute delay) ? |
Featured News
CTN (ASX) Chart |
Day chart unavailable