POS 16.7% 0.7¢ poseidon nickel limited

I would imagine the hole depths would be 100-200m and if the...

  1. 21 Posts.
    lightbulb Created with Sketch. 16
    I would imagine the hole depths would be 100-200m and if the ground is good they will average 40m per shift per rig, so once they start drilling they will get to the ore body fast. (if the ground is good).Webdrill get shit done.
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.001(16.7%)
Mkt cap ! $25.99M
Open High Low Value Volume
0.7¢ 0.7¢ 0.6¢ $4.534K 697.6K

Buyers (Bids)

No. Vol. Price($)
23 22895991 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 18794027 52
View Market Depth
Last trade - 16.10pm 29/05/2024 (20 minute delay) ?
Last
0.7¢
  Change
0.001 ( 0.00 %)
Open High Low Volume
0.6¢ 0.7¢ 0.6¢ 572957
Last updated 15.59pm 29/05/2024 ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.