POS 14.3% 0.3¢ poseidon nickel limited

Ann: Golden Swan Maiden Resource, page-27

  1. 13,234 Posts.
    lightbulb Created with Sketch. 555
    I use a formula, hence density of each drill section varies. I got serious doubt the estimator have used the wrong density and wrong profile.
    ..
    .. In my estimates, density start at 2770/ton and goes all the way to 4850/ton depending on grade and other contents.
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.