Bell Potter LatestAnalyst
David Coates 612 8224 2887
Authorisation
Regan Burrows 618 9326 7677
4 April 2023
Published before midday
Chalice Mining Ltd (CHN) Resource upgrade exceeds expectations
Major Resource upgrade at Gonneville
CHN has announced a major Resource upgrade for the Gonneville deposit, at its 100% owned Julimar Nickel-Copper-PGE (Platinum Group Elements) project, ~70km north of Perth in WA. The upgraded Resource is 560Mt at 0.88g/t 3E (Pt + Pd + Au), 0.16% Ni, 0.09% Cu, 0.015% Co, containing 16Moz 3E, 860kt Ni, 520kt Cu, 83kt Co (~3.0Mt NiEq or ~30Moz PdEq). The latest update has delivered an approximate 60% tonnage increase, and +50% increases in contained palladium and nickel metal, the main value drivers for the Gonneville deposit. The Resource is defined over a strike extent of ~1.9km, from surface to a depth of ~800m and remains open at depth. CHN continues to intersect magmatic sulphides over a strike length of >10km, highlighting the potential for additional discoveries along the >30km long Julimar Complex.
Positive update ahead of our expectations
This is a major positive development for CHN, in our view. It delivers a material increase in the size of the Resource and the Indicated and Measured category has increased by ~63Mt (~26%) over the previous Resource. Importantly, 95% of the Resource above a depth of 200m is now classified as Indicated, hence available for conversion to Reserves to underpin the Scoping Study. The Resource includes a high- grade sulphide component of 120Mt at 1.6g/t 3E, 0.20% Ni, 0.18% Cu, 0.017% Co, containing 5.8Moz 3E, 230kt Ni, 210kt Cu, 20kt Co (~1.0Mt NiEq or ~10Moz PdEq). This adds significant optionality to potential development scenarios for Gonneville, which we view as an advantage. We calculate a discovery cost of A$11.70/oz for the additional contained palladium alone, not only value accretive (CHN is currently valued at ~A$200/ Pd Resource oz) but also competitive with comparable gold sector metrics.
Strategic partnering process underway
This latest Resource update reinforces Gonneville’s status as a Tier-1, globally significant Ni-PGE deposit and should be a positive catalyst for the strategic partnering process that CHN has stated is underway. In the first instance, CHN has targeted a range of downstream, trading and end-user parties. We view this as a sound strategy, designed to add value to the project prior to seeking the involvement of a mining and operating partner. Companies we believe would be attracted to Gonneville include BHP Group (BHP, not rated), Anglo American (AAL:LN, not rated), Glencore (GLEN:LN, not rated) and Sibanye-Stillwater (SSW:SJ, not rated).
Investment thesis – Speculative Buy, Valuation $12.00/sh
CHN’s 100%-owned Julimar project is a globally significant PGE-Ni-Cu deposit. Located 70km north of Perth in WA, it represents a unique opportunity to establish a new, strategic, long-life, low-cost PGE and base metals supply in a top mining jurisdiction. This is reinforced by the inclusion of PGE’s nickel and cobalt on Australia’s and the USA’s critical minerals lists, due to their role in the lithium-ion battery and hydrogen fuel cell production value chain and Russia’s market dominance. The latest Resource update has exceeded our expectations and we lift our valuation by 8%, to $12.00/sh. We retain our Speculative Buy recommendation.
- Forums
- ASX - By Stock
- CHN
- Ann: Gonneville Resource Increases By Approx. 50% to 3Mt NiEq
Ann: Gonneville Resource Increases By Approx. 50% to 3Mt NiEq, page-209
Featured News
Add CHN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.82 |
Change
-0.050(2.68%) |
Mkt cap ! $706.0M |
Open | High | Low | Value | Volume |
$1.83 | $1.86 | $1.78 | $7.657M | 4.214M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5034 | $1.81 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.83 | 13191 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5034 | 1.810 |
2 | 7001 | 1.805 |
7 | 39219 | 1.800 |
5 | 76727 | 1.795 |
5 | 51338 | 1.790 |
Price($) | Vol. | No. |
---|---|---|
1.830 | 13191 | 1 |
1.835 | 246212 | 3 |
1.840 | 13191 | 1 |
1.845 | 13191 | 2 |
1.850 | 21000 | 2 |
Last trade - 16.10pm 31/10/2024 (20 minute delay) ? |
Featured News
CHN (ASX) Chart |