CHN 4.63% $1.34 chalice mining limited

The above is from the CR presentation 11 months ago....the...

  1. 872 Posts.
    lightbulb Created with Sketch. 72
    https://hotcopper.com.au/data/attachments/5210/5210924-5afa6adffbec9b98997cd945258fb515.jpg
    The above is from the CR presentation 11 months ago....the scoping study results are now 6 months past their estimate, due to more met work needed....ad the PFS is yet to start.

    Does anyone have any insight into when a BFS might be completed, and how much it will cost?

    From the size and of the deposit and its uniqueness I reckon it might be 2030 before they ramped up in production. Are there any other timelines out there for BFS, construction and ramp up or is everyone holding on for a TO sometime in the next few years?
 
watchlist Created with Sketch. Add CHN (ASX) to my watchlist
(20min delay)
Last
$1.34
Change
-0.065(4.63%)
Mkt cap ! $521.2M
Open High Low Value Volume
$1.38 $1.40 $1.34 $3.420M 2.509M

Buyers (Bids)

No. Vol. Price($)
1 995 $1.34
 

Sellers (Offers)

Price($) Vol. No.
$1.35 14858 2
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
$1.34
  Change
-0.065 ( 4.74 %)
Open High Low Volume
$1.38 $1.40 $1.34 852312
Last updated 15.59pm 14/06/2024 ?
CHN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.