AUZ definitely own their own small scale mini plant, this has been in continuous use refining the production process, shortening the start and ramp-up time for once the full size plant is built to spec.
They have claimed substantial knowledge has been obtained through the process.
They are additionally going to use the plant for refining the process of Flemmington and Thackaranga as well.
I believe that AUZ would use the plant continuously processing ore, learning and generating a payback for the capex spent. AUZ have 3 different resources in 3 different geographic areas all with different resource chemistries. This would justify the costs of their own 100% owned plant imo.
Similus would need their own mini plant to test samples for their clients.
- Forums
- ASX - By Stock
- Ann: Goongarrie Nickel-Cobalt Project Pilot Plant trials commence
AUZ definitely own their own small scale mini plant, this has...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ARL (ASX) to my watchlist
(20min delay)
|
|||||
Last
37.5¢ |
Change
-0.025(6.25%) |
Mkt cap ! $74.88M |
Open | High | Low | Value | Volume |
39.5¢ | 40.0¢ | 37.5¢ | $50.49K | 129.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 14286 | 37.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
40.0¢ | 1729 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 14286 | 0.375 |
1 | 8000 | 0.370 |
1 | 10000 | 0.365 |
1 | 5000 | 0.360 |
1 | 8 | 0.355 |
Price($) | Vol. | No. |
---|---|---|
0.400 | 1729 | 1 |
0.420 | 12300 | 1 |
0.425 | 3760 | 1 |
0.430 | 3255 | 1 |
0.435 | 2289 | 1 |
Last trade - 15.26pm 04/10/2024 (20 minute delay) ? |
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
ARL (ASX) Chart |