the baby woke me up, now I can’t sleep. Thought I’d just post up a little bit of info for you to read over. This stuff is date 2018 so I’m not overly surprised a lot of this was missed.
metallurgical testwork results:
https://malilithium.com/pdfs/ExcellentMetallurgicalTestworkResults17Sep19.pdf
logistical costs :
now initially $87pt was thrown out there. There’s been some great research into the logistics and there is nothing in the DFS that I feel flags going on previous works. I’ll add MOU signed with CIM. Important to note the company has visited the port, they have had ‘boots on the ground’. We all wanted the DFS ages ago, true, but it doesn’t mean other works weren’t being done. I hope these 2 announcements help with a few of your questions
https://malilithium.com/pdfs/GoulaminaLithiumProjectRisksSignificantlyReduced07Oct19.pdf
- Forums
- ASX - By Stock
- FFX
- Ann: GOULAMINA LITHIUM PROJECT DEFINITIVE FEASIBILITY STUDY
Ann: GOULAMINA LITHIUM PROJECT DEFINITIVE FEASIBILITY STUDY, page-73
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FFX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
TON
TRITON MINERALS LTD
Adrian Costello, Executive Director
Adrian Costello
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online