LLL 0.00% 50.5¢ leo lithium limited

I'm not sure if DSO is feasible at current prices.From the table...

  1. 4,047 Posts.
    lightbulb Created with Sketch. 6786
    I'm not sure if DSO is feasible at current prices.
    From the table below we might get $290/t interpolating to 1.6%
    I presume this is a FOB cost, our trucking & port costs are $100/t from the DFS (excludes shipping)

    That leaves $190/t for mining, crushing to 6mm, royalty etc etc
    Simon's first estimate at production cost was US$50 lower than the DFS cost so $262/t (C1 DFS $312/t)
    Then a month later (Dec'22) said US$260-300 FOB Abidjan
    Then at the AGM said "will come out with a better price estimate than the conservative 300-350/t"

    So no matter which figure you use, there is going to be very little profit if any at current prices.
    So IMO DSO is mostly a non issue - don't tell the Mali Govt that though.
    Of course we do want to test & commission the logistics.



    https://hotcopper.com.au/data/attachments/5573/5573334-d52385eaecbe562c170a699faabff122.jpg
 
watchlist Created with Sketch. Add LLL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.