Im probably a bit like you, more going off what i know of, that was the size of an articulated trailer on tracks.
It could be smaller, but will come down to the feed size and the hourly throughput.
The Core DSO looked fairly fine.
The costs with these things is that you want it temporary.
- Forums
- ASX - By Stock
- LLL
- Ann: Goulamina Project Mid-Term Status Update
Ann: Goulamina Project Mid-Term Status Update, page-70
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable