Originally posted by Riglife:
↑
These guys have big problems at Onslow with trucking and water supply. Every time a barge comes in to port they have to turn off the suction lines for their desal plant. As they're ramping up production the barges are more frequent and it'll get to a stage where they have limited water for the plant. They've also had 3 trucks rollover as they can't cope with the trailers so all trucks travel no faster than 50km/h fully loaded possibly up to 60. This means more trucks and much more expense. I heard this yesterday from a worker out there.
Expand
Well done on securing this information. I have to admit I didn't even knew MinRes has a desalination plant? May sound really stupid if there is an obvious answer here - what part of our flowsheet requires desalinated water?