G'day Towie. We also have to remember that ML100030, the current project, is only 10% of the overall Agate Creek tenement and less than 25% of the other 90% has been covered with testing and has defined "numerous high priority regional targets.
They literally haven't even scratched the surface and the current JORC for Sherwood and Sherwood West, and the "high grade" areas must surely be up for review after those results from the 51 holes!!
It's just a work in progress and if people want to wait and watch it develop, I can see them having some fun and possibly make a quid, but, apart from the highly anticipated catalyst from the granting of the ML (hijacked by management's pathetic naivety and possibly lost) there's not too many on the horizon to stir the emotions, maybe, the commencement of mining.
- Forums
- ASX - By Stock
- SVG
- Ann: Grant of Mining Lease for Agate Creek Gold Project
Ann: Grant of Mining Lease for Agate Creek Gold Project, page-50
-
- There are more pages in this discussion • 107 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Add SVG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.183M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
SVG (ASX) Chart |
Day chart unavailable