Hey Joe, Ditto!
This is the last roll of the dice, so I don't belive Dennis and the crew will miss the deadline. They must start drilling before the 30th September, otherwise the DOE will get cranky......The move was going to take place start of August and it's only 20 meters to the new site.
I'm sure if they need it, all the shareholders could jump on a plane to Cebu and drag the bloody thing 20m !!
Hang in there mate, not long now...........
- Forums
- ASX - By Stock
- Ann: Granted Extension Time for Nuevo Malolos 1 Deepening
Hey Joe, Ditto!This is the last roll of the dice, so I don't...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.077M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GGX (ASX) Chart |
Day chart unavailable