Sold at .033. Not bad 40% profit in a week. Thank You.
Still a lot of loss to recover on this one. Be back when it goes down
again. I should have been doing this from the start. GLTAH
- Forums
- ASX - By Stock
- G79
- Ann: Graphite Vanadium Project on track first production mid 2019
Ann: Graphite Vanadium Project on track first production mid 2019, page-31
-
- There are more pages in this discussion • 68 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)