Hopefully we hear this week or next about the commissioning of the drying circuit. Testing the new drier and verify if it does the job well is crucial, it was the main bolttlneck opreation in the previous mine. This would be a big derisking event for the refurbished mine. The drying circuit is the most important piece, I am not worried about the rest of equipment (processing), because even with older insufficient equipment we already hit 6000tpa albeit in an inconsistent manner. Cant wait for first tests of the drier !
- Forums
- ASX - By Stock
- GW1
- Ann: Graphmada Graphite mine Operational Update
Ann: Graphmada Graphite mine Operational Update, page-123
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GW1 (ASX) to my watchlist
|
|||||
Last
4.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.975M |
Open | High | Low | Value | Volume |
4.4¢ | 4.4¢ | 4.4¢ | $2.2K | 50K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 432247 | 4.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.8¢ | 24000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 432247 | 0.044 |
5 | 448051 | 0.040 |
1 | 100000 | 0.030 |
1 | 39888 | 0.022 |
2 | 300000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.048 | 24000 | 1 |
0.050 | 3744 | 1 |
0.060 | 50016 | 1 |
0.064 | 9810 | 1 |
0.069 | 130237 | 1 |
Last trade - 14.40pm 05/07/2024 (20 minute delay) ? |
Featured News
GW1 (ASX) Chart |