Not at all. Just the fact that if they proceed to dig up better quality U/G ores, the targer annual volume of 110Koz or 28,600Koz can surely be delivered for the June quarter. This is not a high bar. And if they can deliver more then so much the better.
Thanks very much for your feedback.
Cheers.
DCN Price at posting:
33.5¢ Sentiment: Buy Disclosure: Held